Project Portfolio
Burj Khalifa
Metaline LLC was chosen as the metal fabricator for the prestigious Burj Khalifa Tower, currently recognized as the tallest structure in the world. The project included all the mild steel and stainless steel works for the pump stations, landscaping and water features of the Burj Khalifa.
Dubai Mall
Metaline was the chosen metal fabricator for Dubai Mall, the largest shopping mall in the world. The project included the fabrication and supply of stainless steel bollards and handrails as well as the pump room equipment, water features and the metal works of the Grand Drive.
Acacia LLC
Metaline has an expert team of structural fabricators. We have successfully completed the fabrication and erection of green house and glass house structures for the Acacia nurseries located in Warsan and Mushrif, Dubai.
Dubai Silicon Oasis
Metaline was the chosen metal fabricator for the Dubai Silicon Oasis villa complex. The project included the fabrication and supply of wrought iron gates, signboards, grills, and boundary wall fence as well as mild steel pergolas and stainless steel wire rope handrails, in and around the DSO villa complex.
Al Raha Beach Developments
Al Raha Beach Developments: Metaline has successfully executed the fabrication and supply of the metal works for Al Bandar Island Abu Dhabi, including stainless steel wire rope handrails, mild steel gates, copper canopies, pump room works and stainless steel water feature works.
Al Bandar Bridge
Metaline has also completed the mild steel works for the installation of timber decking as well as stainless steel perforation sheet works under the bridge connecting the Al Bandar Island to the main island in Al Raha development project.